Division of School Facilities


Current Event
New emergency hotline (718)668-8870 for up-to-date information about school and office closings as well as other important notifications
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
Bathroom renovations completed under the DSF Capital Bathroom projects for P.S. 368 (K368) located inside I.S. 33 – Brooklyn (K033)
Click to view the large image

Bathroom renovations completed under the DSF Capital Bathroom projects for P.S. 368 (K368) located inside I.S. 33 – Brooklyn (K033).

West End Secondary school newly opened at the old Beacon High School building this past August.
Click to view the large image

DSF was tasked with the renovation of the former Beacon High School Building. We installed new signage, freshly painted the interior, converted an existing room to a school library and helped with the move.

P.S. 165 has a new expanded pre-k classroom.
Click to view the large image

At P.S. 165, DSF created a new pre-k classroom by reconfiguring an existing room. The project included enlarging an old classroom and connecting it to an existing pre-k room.

DSF refinished the gymnasium floor at Q397 District 30

DSF refinished the gymnasium floor at Q397 District 30

The new gymnasium court at M625, renovated under the NBA / DSF FIT program
Click to view the large image

Ready for game! Another NBA / DSF Fit project completed. This time at the HS of Graphics Communication Arts (M625).

The R061 gymnasium that was just refinished under the NBA FIT program
Click to view the large image

The R061 gymnasium that was just refinished under the NBA FIT program

New gymnasium floor installed at P.S. 79
Click to view the large image

Division of School Facilities installs a new gym floor for P.S. 79 (the Horan School) in Manhattan.

The newly finished Gym Floor at M010
Click to view the large image

The Gym Floor was sanded and refinished completely with new game lines and logos.

M387 Success Academy in Washington Heights displays its completed renovation projects.
Click to view the large image

M387 Success Academy in Washington Heights (which serves grades K through 12) in collaboration with the Division of School Facilities, displays its completed renovation projects. Here are several pictures on display. Included is one of its classrooms, the school library and gymnasium; and before / after shots of its art room, cafeteria area and first floor hallway.

Manhattan’s P.S. 154 renovated its gymnasium floor

Manhattan’s P.S. 154 The Harriet Tubman Learning Center (which serves grades K-5) in collaboration with the Division of School Facilities, renovated its gymnasium floor. The picture of Harriet Tubman which was installed honors the proud history of the school and serves as a conversation piece for all who enter the gymnasium.

DSF installs new volleyball equipment at X002 (P.S. 2 Morrisania).
Click to view the large image

New volleyball equipment was recently installed at X002 in the Bronx.

Opening day at P.S. 069 Journey Prep School in the Bronx
Click to view the large image

Mayor de Blasio and Chancellor Fariña visited P.S. 069 on opening day of school. During their visit they commended school fireman Israel Reyes for his artwork which adorns the cafeteria. Mr. Reyes took the opportunity to pose with Chancellor Fariña for a quick photo.

X129 in the Bronx gets a new Kitchen

M.S. 129 Academy for Independent Learning and Leadership received a new kitchen upgrade, which was completed by the Division of School Facilities.

Mayor de Blasio meets Custodian Engineer Ottavio Lamantia of the Bronx Academy for Software Engineering.

On May 21, 2014, Mayor de Blasio and Chancellor Fariña visited the Bronx Academy for Software Engineering which is one of the schools located at the Grace Dodge Campus. The Mayor toured the trade school during Internet Week to promote more software programs in NYC schools.

Creatively cut shrubbery at I.S. 323

Custodian Anthony Persaud of K263 (I.S. 323) found a creative way to trim the bushes.

X367 gets new volleyball equipment
Click to view the large image

New volleyball equipment was recently purchased and installed at X367 in the Bronx.

I.S. 98 - Brooklyn gets a new Gym floor
Click to view the large image

The gym floor at the Bay Academy for Arts and Sciences was recently renovated and replaced.

GATEWAY